Product Overview

The ZGS(YB)□-12 pad mounted utility transformer is a factory-assembled power supply unit for the distribution network. It puts the high-voltage control and protection circuit, the transformer and the low-voltage distribution equipment in one outdoor enclosure, so a utility or contractor receives one finished unit.
It is Gangheng's first domestically developed American-style box transformer and belongs to our Transformer Substation range. If you also need low-voltage schemes and reactive compensation, see the Pad Mounted Substation page.
Zhejiang Gangheng Electric Company Limited, founded in 2004, builds this pad-mounted utility transformer in Jiangshan, Zhejiang, on CNC punching, CNC bending, laser cutting and copper busbar bending equipment, with its own testing equipment.
How the Unit Connects to Your Network
-

The high-voltage side offers four supply schemes. All use an FYN-12 load switch (315–630 A).
Scheme
Supply Arrangement
I
Terminal supply
II
Dual-source supply
III
Ring network + dual-source supply
IV
HV metering
Connection and maintenance features:
- The fully sealed, fully insulated design is intended to protect personnel.
- A bayonet-type (plug-in) fuse and elbow cable connector are used. Replacing the fuse does not affect the transformer body.
Technical Parameters
This pad-mounted utility transformer is specified through its HV load switch and its transformer body.
Pad Mounted Utility Transformer



|
Load Switch Parameter |
400 A type |
630 A type |
|
Rated Voltage |
12 kV |
12 kV |
|
Impulse Withstand |
75 (85) kV |
75 (85) kV |
|
Power-Frequency Withstand |
42 (48) kV |
42 (48) kV |
|
Peak Withstand Current |
31.5 kA |
40 kA |
|
Load Breaking Operations |
100 |
100 |
|
Mechanical Operations |
2,000 |
3,000 |
|
Transformer Body |
Specification |
|
Capacity |
80–1600 kVA |
|
HV / LV |
6, 6.3 or 10 kV / 0.4 kV |
|
Protection Degree |
IP33 |
Standard configuration follows GB/T. ANSI/IEEE, BS and other standards can be applied on request. Full loss and no-load current data are on our oil filled pad mounted transformer page.
-
Customization and Ordering

Three enclosure forms are available: standard, reinforced and composite. The LV side can follow a standard scheme or be designed to your requirement.
With transformer capacity and drawings, we design a matching configuration.
Without parameters, tell us the site, the load of the equipment and the function you need. Our engineers propose a configuration.
Pricing: In most cases a customized configuration costs the same as the standard one. Depending on the configuration, the enclosure width may be increased.
No minimum order quantity. One unit is accepted.
To order, provide: (1) transformer model and capacity; (2) HV and LV main circuit diagrams; (3) models and specifications of special components; (4) enclosure color (the manufacturer decides if none is specified); (5) names and quantities of spare parts.
-

Supply Arrangements Supported
Terminal supply (Scheme I) · Dual-source supply (Scheme II) · Ring network + dual-source (Scheme III) · HV metering (Scheme IV)
Quality Certification
ISO 9001 · ISO 14001 · OHSAS 18001 · CCC.
Gangheng's products are listed on the State Grid e-commerce procurement platform, and Gangheng is a qualified supplier to State Grid and China Southern Power Grid.
Manufacturing and Quality Control
Founded in 2004, with more than 20 years in power distribution equipment; a national high-tech enterprise holding 5 utility-model patents.
The Jiangshan base is under 3 km from the Quzhou South exit of the G3 expressway and under 7 km from Jiangshan railway station; National Highway 205 and the Zhejiang–Jiangxi railway pass through.
50–200 employees; 5,000–20,000 m² site; annual revenue CNY 50–100 million.
Track Record
|
Case |
Detail |
|
Xianglong Coal Mine, China |
American-style substation for a mining site, 2016 |
|
Shangrao Qianshan Jizhi |
Customized batch of KYN28-12 switchgear, passed acceptance |
|
Zhejiang Wangpai Home |
Fixed-type switchgear supplied continuously since 2015 |
|
CHN Energy Shendong Coal Group |
Box-type substation for a mining area, 2020 |




Delivery and Trade Terms
No minimum order. About USD 300,000: 30 days · about USD 700,000: 45 days · about USD 1,500,000: 60 days. All equipment is new and unused.
Warranty and After-Sales
12-month free warranty after acceptance, then 5 years of hidden-defect protection. 24/7 on-site support; spare parts priced no higher than market. Technical documents and training. Quality inspection and defect handling during installation and commissioning.
Frequently Asked Questions
Q: Which supply schemes does this pad mounted utility transformer support?
A: Terminal, dual-source, ring network with dual-source, and HV metering, all with an FYN-12 load switch.
Q: What are the capacity and voltage ranges?
A: 80–1600 kVA; HV 6, 6.3 or 10 kV; LV 0.4 kV.
Q: Is the fuse easy to replace?
A: The plug-in fuse can be replaced without affecting the transformer body.
Q: Can it follow ANSI/IEEE or BS?
A: GB/T is standard; ANSI/IEEE, BS and other standards can be applied on request.
Q: Is there a minimum order and what is the lead time?
A: No minimum. Lead time depends on order value, as in the table above.
Q: What does the warranty cover?
A: 12 months free after acceptance, plus 5 years of hidden-defect protection.
Q: What do I send when ordering?
A: The five items listed under Customization and Ordering.
Hot Tags: pad mounted utility transformer, China pad mounted utility transformer manufacturers, suppliers, factory